PINAR FACILITY
At our Pınar Facility located in the junction of Abdullah Brook and Doğan Creek in the north of Aladağ District, the concentrated chrome of 30,000 tons/year of grade of 48% of Cr2O3 is produced at our facility having an installed power of 1500 kw and a capacity of 1400 tons/day and 520,000 tons/year with two (2) main mills, one (1) auxiliary mill, and 112 tables. The concentrated produced is dispatched by trucks to our stocking site located in Adana.