ABDULLAH BROOK Chrome BED
Abdullah Brook chrome bed site is 9 km away from Aladağ district and 2 km from Kumbükü chrome concentrate facilities.
A drilling of 8,325.5 meters had been carried out at 98 locations in total in the year 2012 in the site. The mineralization at Abdullah Brook-1 mine is in northwest-southwest direction and inclined to the southwest with 35-50 degrees. The mineralization at Abdullah Brook-2 mine is in northeast-southwest direction and inclined to the southeast with 30-60 degrees.
A 6,40% Cr2O3 graded reserve of 2,003,332 tons on average extractable by open operating project was determined by the studies carried out at Abdullah Brook-1 site. Topsoil/Excavation ratio is 1/9.5. A 5,70% Cr2O3 graded reserve of 413,562.82 tons on average extractable by open operating project was determined by the studies carried out at Abdullah Brook-1 site. Topsoil/Excavation ratio is 1/14.
A 6-7% Cr2O3 graded visible + possible reserve of approximately 4,000,000 tons is expected at both quarries.